* In 2004/2005 we actually participated in the unloading of 55.000 tons of 36 m-long rails for the 1st stage Ankara-Eskişehir section under the FAST TRAIN PROJECT between ANKARA and ISTANBUL, construction of which was awarded to the joint venture companies ALARKO/OHL/G&O, in the Bandırma TCDD Port using special equipment from the ship, properly stacking them and loading the rails on the railway wagons in conformity with the TCDD instructions and forwarding them to the work sites under the 20 month-long project operations.
** In 2008/2009 we actually participated in the unloading of 56.000 tons of 36 m-long rails for the fast train project between Ankara and Konya, construction of which was awarded to the company YAPI MERKEZİ İNŞAAT VE SANAYİ A.Ş., using special equipment from the ship in the Iskenderun TCDD port, properly stacking them and loading the rails on the railway wagons in conformity with the TCDD instructions and forwarding them to the work sites under the 12 month-long project operations.
Taking place in the story of realizing the Project for Upgrading the existing Ankara-Istanbul, Ankara-Konya railways, which would change the appearance of our country and State Railways gives us strength and honor. We think that reason why the companies, which are trademarks, that undertook the construction responsibility of both projects, preferred us is, our 30 year-long experience and accumulation of knowledge on the railways as well as the commitment and discipline we have demonstrated in completing the responsibility we have undertaken flawlessly and within the period stipulated. By taking part in the handling operations of the 36 meter-long rails, which were imported to Turkey for the first time, with its young and dynamic staff, has elevated the position of RayKon Logistics to higher levels in the logistics sector to a more assertive stance. Placing our signature under such projects in the recent years makes us powerful and indispensable,
* As being Alican Öcel
** As being Alican Öcel
The transport operation of rails, which will be used in 2009/2010 AVRASYA METRO GROUP’s Kadikoy-Kartal Metro Construction Work and Electromechanical Systems Procurement, Installation and Commissioning Project, from TCDD Haydarpasa port to Kartal construction site, and transfer to the vehicles with special equipments.
The discharge operation of 125000 tons of rails, which dimension is E49 E60 36 meters and imported from Italy by 2010/2011-TCDD GENERAL DIRECTORATE, from ship to port area at the port of Iskenderun and stowing operation according to procedure. Project continues..
Please
contact us for your fast train railway needs